The Zanjan power plant is located at 25 km of the Zanjan-Tehran highway.
Niroo Va Tavan Company implemented the power plant as an EPC contractor.
NVT has implemented the following in the engineering department:
- Piping Arrangement for Fuel oil, gas & Aux. steam and boiler systems.
- Process flow diagram (PFD) for fuel oil and gas systems.
- Piping route and key plan for fuel oil, gas, Aux. steam and boiler system.
- Datasheet of equipment, valves, pipes, tanks for fuel oil, gas, and Aux. steam systems.
- 2000 m^3 tanks drawing for fuel oil (shell, bottom, roof, structure, and nozzle).
- Fire fighting PFD (foam and water system)
- Service water distribution system PFD
- Fire Alarm and detection system equipment specification, catalog, and datasheet.
Niroo Va Tavan Company has procurement and erection of the following items in the project:
- Water supply system.
- Sewage treatment and disposal system.
- Fire detection and extinguishing system. (Hydrant, Foam, Spray, …)
- Auxiliary steam system and accessories.
- Fuel oil storage tanks.
- Unloading station and bay equipment.
- Fuel oil piping material as a pipe, valves, fitting, 3way valve.
- The fuel oil system, I&C, and electrical materials.
- Fuel gas system equipment and piping material.
- Fuel gas system, I&C, and electrical materials.